Engineering of a WWTP in Asenovgrad

Project Timeline: 02/04/2014 – 06/05/2018

Article: https://www.actualno.com/asenovgrad/59-tata-prechistvatelna-stancija-po-op-okolna-sreda-v-asenovgrad-news_571282.html

“A turnkey and 59th WWTP of the rapidly growing network in Bulgaria to be located in Asenovgrad”
The 12-million-euro contract for execution will be handed over by Interprom LTD. The WWTP is engineered to serve more than 55 000 people. An important project of the pipeline, it will be built with state-of-the-art equipment.

Read Full Article